SMT Rio Grande II
10 MW / 20 MWh · CATL · Fluence · COD 2024
Period comparison
The reason is the point, not the delta
SOC down 0.14 pts vs last week.
Availability analytics
Click any day for root cause, forecast and revenue impact
No penalty crystallised: a DC combiner fault tripped two strings offline, but the field crew cleared it and restored full output within the same settlement week — availability recovered before period close.
Recovered before the settlement period closed, so no penalty crystallised. No recurrence signal in the eight weeks since; availability forecast holds ~98.2%.
No action required — the asset recovered before close. Keep the combiner on the preventative inspection list to protect the clean settlement.
Recommendations for this site
Plain English, ranked by impact
Contract position
Money-attached, each figure carries its evidence
Warranty floor trajectory
Measured SOH vs warranted curve vs the contract floor
Open alerts
1 current open findings on this site
SOH fell 2.0pts this quarter, faster than the warranted curve, while cycling stayed within the 700-cycle envelope — an accelerated cell-level degradation the OEM warranty covers, not owner over-use.
Digital twin
Container and rack severity · click a flagged rack to open its finding
Rack-level view, kept shallow by design. B9 stays at the contractual and financial layer, not cell diagnostics.