Warranty Dossier

Prepare and file OEM warranty claims from measured state-of-health evidence. Each asset is assessed against its warranted degradation curve and contractual floor, with the supporting evidence assembled into a submission-ready claim file.

ScopeAll owners
Assets under warranty8
Open claims1
Asset register · ordered by margin to warranty floor8 assets
Qualifying claim
SMT Rio Grande II
CATL · LFP · 10 MW / 20 MWh
WCL-2026-RGII-724423 days to file
Amount claimed
$620K
Measured SOH
90.6%
Warranted now
95.4%
Vs warranted
-4.8 pts
Warranty floor
90%
Crosses floor
~8 wks

SOH fell 2.0pts this quarter, faster than the warranted curve, while cycling stayed within the 700-cycle envelope — an accelerated cell-level degradation the OEM warranty covers, not owner over-use.

If not filed: SOH crosses the 90% floor in roughly 8 weeks. The claim window for the accelerated-degradation event closes and the augmentation claim is forfeited.

Grounds for claim · why it qualifies4 / 4 satisfied
Degradation rate exceeds the warranted rateMeasured −2.0 pts/qtr vs warranted −0.3 pts/qtr
Capacity tracking below the warranted curve90.6% measured vs 95.4% warranted (-4.8 pts)
Operation within the contractual cycle envelope648 / 700 cycles projected — within envelope
Notified within the contractual claim window23 days remaining (window closes 07 Aug 2026)

Claim file

6 exhibits · evidence register

File readiness4/4 conditions

All qualifying conditions satisfied. Evidence register complete and reconciled to source systems — ready for submission.

  1. A
    Measured state-of-health series
    SMT Rio Grande II BMS export
  2. B
    Warranted degradation curve & capacity floor
    CATL Cell Capacity Warranty, Sch. 1 / Cl. 4.2 — Capacity Retention
  3. C
    Cycle-count / throughput log
    SMT Rio Grande II EMS (Fluence)
  4. D
    Warranty-floor trajectory & crossing analysis
    B9 analytics engine
  5. E
    Augmentation cost basis
    Contract augmentation schedule
  6. F
    Round-trip efficiency & availability records
    SMT Rio Grande II EMS metering

Submission-ready PDF · evidence register · integrity-referenced

Warranty floor trajectory

Measured SOH vs warranted curve vs the contract floor

Crosses floor in ~8 weeks
Measured SOH
Projected
Warranted curve
Floor 90%
Projected crossing: Sep 26

Contract position

Money-attached, each figure carries its evidence

Warranty envelope (cycles)
430 cycles headroom · 8 yrs term remaining
270 / 700
Availability vs guarantee
+0.2 pts vs 98% guarantee
98.2%
RTE vs warranted
+1.1 pts vs 85% warranted
86.1%

Portfolio warranty register

State-of-health margin and projected floor crossing across every asset

AssetSOHWarrantedFloorMarginCrosses floorPositionDossier
SMT Rio Grande II90.6%95.4%90%+0.6 pts~8 wksClaimable
SMT Harlingen II93.2%95.4%90%+3.2 ptsIn warranty
SMT Laredo94.6%96.9%90%+4.6 ptsIn warranty
SMT Bay City94.8%96.9%90%+4.8 ptsIn warranty
SMT Dallas95.1%96.9%90%+5.1 ptsIn warranty
SMT Corpus95.9%96.9%90%+5.9 ptsIn warranty
SMT Houston IV96.1%96.9%90%+6.1 ptsIn warranty
SMT Dallas III97.4%98.8%90%+7.4 ptsIn warranty