SMT Bay City
10 MW / 20 MWh · CATL · Wartsila · COD 2025
Period comparison
The reason is the point, not the delta
SOC down 0.5 pts vs last week.
Availability analytics
Click any day for root cause, forecast and revenue impact
Positive deviation, no revenue at risk: scheduled quarterly maintenance finished a day ahead of plan, returning the asset to full availability early and lifting uptime ~0.8 pts above its normal band.
Availability forecast to hold the restored buffer; no follow-on risk.
No action required — capture the early return as a schedule credit in the O&M report.
Recommendations for this site
Plain English, ranked by impact
Contract position
Money-attached, each figure carries its evidence
Warranty floor trajectory
Measured SOH vs warranted curve vs the contract floor
Open alerts
2 current open findings on this site
412 of 700 annual cycles used by month 5. Arbitrage cycling has run harder than the warranty throughput assumes.
Flip-schedule performance package for the Bay City and Harlingen II LLCs is due to the tax-equity partner, currently assembled by hand.
Digital twin
Container and rack severity · click a flagged rack to open its finding
Rack-level view, kept shallow by design. B9 stays at the contractual and financial layer, not cell diagnostics.